Skip to product information
1 of 13

Borcelleclothes

Curve Quilted Sheepskin Coat — Under Paris Skies

Curve Quilted Sheepskin Coat — Under Paris Skies

Regular price $1,647.00 CAD
Regular price $405.01 CAD Sale price $1,647.00 CAD
Sale Sold out

Taxes included. Shipping calculated at checkout.

Color
Size

She doesn’t look like she stepped out of a doorway —
but out of a French film.

There’s no hurry in her walk.
No trend in her hat.
Only a quiet gesture —
like a memory of something important.

The color of her coat isn’t sky, or blue, or grey.
It’s Paris Skies:
a shade where morning windows dissolve,
where old façades fade gently,
and where glances thrown by chance
feel like they were meant to stay forever.

It doesn’t shine — it holds its light.
It isn’t cold — it’s composed.
It doesn’t ask to be seen —
it simply stays in the memory.

The coat is stitched in zigzags across the chest — like crossroads.
And at the bottom, soft curves echo
a steady rhythm —
a heartbeat, perhaps.
The pulse of a city that never demands to be loved —
and yet, everyone wants to return.

This is not just a coat.
It’s an impulse —
to see, to feel, to pause,
and to say, quietly:
“I didn’t know I missed this… until I saw it.”

Style details:

  • A-line silhouette
  • Zip front closure with concealed snap placket
  • Hood trimmed with tonal Fox fur
  • Adjustable waist with concealed inner drawcord for a customizable fit
  • Extended side patch pockets with curved Fox fur trim
  • Set-in long sleeves
  • Mid-calf  length
  • Color: Paris Skies
  • Decorative stitching: zigzag quilted pattern on bodice; rhythmic curved pulse-like stitching on the bottom section
  • Outer Composition: Genuine Sheepskin 
  • Inner Composition: 100% Polyester
  • Filler: White Goose Down.
View full details